one direction lane restriction for transportation services on Dvp S Eastern Av W Ramp (between Do…
★ Quick facts
- Location
- Between between Don Valley Parkway S and Don River
- Start date
- Sun, Sep 20, 2026 · 10:30 PM
- End date
- Fri, Sep 25, 2026 · 5:30 AM
- Lanes affected
- Road Closed Construction; One Direction
- Severity
- HeavyFull ramp closure
Traffic context
Traffic today
This closure is one part of the day. The daily brief shows the event load, other road work, and the likely busy window from the same calendar data.
- Day status
- Severe
- Busy window
- Likely busiest 8 AM to 8 PM as event traffic overlaps with afternoon rush hour.
- Main signal
- Zach Bryan + Staind: Break The Cycle 25th Anniversary Tour + Charli xcx
- Zach Bryan
- Staind: Break The Cycle 25th Anniversary Tour
- La Scala Lane
What's affected
Dvp S Eastern Av W Ramp between between Don Valley Parkway S and Don River is impacted by a full ramp closure. The source lists affected lanes as: Road Closed Construction; One Direction.
Corridors to compare: Bayview Avenue parallels the DVP south of Pottery Road; Mount Pleasant Road and Yonge Street are separate north–south surface corridors with signals and local access. Which one wins depends on the day — check a live map before you leave.
Same-day events
- Thee Sacred Souls, LA LOM, & The Womack Sisters
Sep 20 · RBC Amphitheatre
- Toronto International Film Festival (TIFF)
Sep 20 · TIFF Bell Lightbox / Various
- Toronto Tempo vs. New York Liberty
Sep 20 · Coca-Cola Coliseum
- Barrie Construction
Sep 20 · Toronto transit
- Zach Bryan - With Heaven On Tour
Sep 21 · Rogers Centre
- Staind: Break The Cycle 25th Anniversary Tour
Sep 21 · RBC Amphitheatre
- Charli xcx - Music, Fashion, Film Tour
Sep 21 · Scotiabank Arena
- Zach Bryan - With Heaven On Tour
Sep 22 · Rogers Centre