TODAY / AUG 7HEAVY
YONGE ST · FULL ROADWAY CLOSURE · YONGE ST AT DUNDAS ST W TO SHUTER STQUEEN ST W · LANE CLOSURE · NEAR YONGE ST
416TRAFFIC
ConstructionTue, Aug 4, 2026 – Sun, Aug 16, 2026HWY 400 (Northbound)

Nightly Moving Maintenance Closure on HWY 400 Northbound between JANE STREET, Toronto and 5TH LIN…

Construction · Tue, Aug 4, 2026 – Sun, Aug 16, 2026
★ IMPACT 4/5 · ★ SOURCE-BACKED CLOSURE RECORD

Quick facts

Location
At JANE STREET
Start date
Tue, Aug 4, 2026 · 7:00 PM
End date
Sun, Aug 16, 2026 · 6:00 AM
Lanes affected
1 Alternating Lane(s)
Severity
Heavy
Source
Ontario 511Event ID 283112

Traffic context

Traffic today

This closure is one part of the day. The daily brief shows the event load, other road work, and the likely busy window from the same calendar data.

Day status
Heavy
Busy window
Arrival pressure likely builds 6 PM to 8 PM.
Main signal
ALL THE FEELINGS TOUR with METRIC, BROKEN SOCIAL SCENE, AND STARS + National Bank Open Toronto + RUSH: Fifty Something
  • ALL THE FEELINGS TOUR with METRIC, BROKEN SOCIAL SCENE, AND STARS
  • National Bank Open Toronto
  • Yorkville Ave

What's affected

HWY 400 (Northbound) at JANE STREET is impacted by construction work. The source lists affected lanes as: 1 Alternating Lane(s).

Corridors to compare: Highway 27 and Yonge Street run north–south south of King City; both are surface corridors with signals and local access. Which one wins depends on the day — check a live map before you leave.

Same-day events

Plan ahead

Read next