TODAY / SEP 3SEVERE
416TRAFFIC
ConstructionThu, Sep 10, 2026 – Fri, Sep 11, 2026HWY 400 (Northbound)

Continuous Engineering Investigation on HWY 400 Northbound On-ramp at JANE STREET, Toronto.

Construction · Thu, Sep 10, 2026 – Fri, Sep 11, 2026
★ IMPACT 4/5 · ★ SOURCE-BACKED CLOSURE RECORD

Quick facts

Location
At JANE STREET
Start date
Thu, Sep 10, 2026 · 11:00 PM
End date
Fri, Sep 11, 2026 · 5:00 AM
Lanes affected
1 Right Lane(s)
Severity
Heavy
Source
Ontario 511Event ID 302990

Traffic context

Traffic on Thu, Sep 10, 2026

This closure is one part of the day. The daily brief shows the event load, other road work, and the likely busy window from the same calendar data.

Day status
Heavy
Busy window
Arrival pressure likely builds 7 PM to 8:30 PM.
Main signal
Lily Allen Performs West End Girl + Toronto International Film Festival (TIFF) + TTC Line 1 (Yonge-University)
  • Lily Allen Performs West End Girl
  • Toronto International Film Festival (TIFF)
  • TTC Line 1 (Yonge-University)

What's affected

HWY 400 (Northbound) at JANE STREET is impacted by construction work. The source lists affected lanes as: 1 Right Lane(s).

Corridors to compare: Highway 27 and Yonge Street run north–south south of King City; both are surface corridors with signals and local access. Which one wins depends on the day — check a live map before you leave.

Same-day events

Plan ahead

Read next