TODAY / AUG 7HEAVY
YONGE ST · FULL ROADWAY CLOSURE · YONGE ST AT DUNDAS ST W TO SHUTER STQUEEN ST W · LANE CLOSURE · NEAR YONGE ST
416TRAFFIC
Road closureWed, Aug 5, 2026 – Sat, Aug 8, 2026HWY 401 (Westbound)

Nightly Construction on HWY 401 Westbound Transfer at MORNINGSIDE AVE, Toronto.

Road closure · Wed, Aug 5, 2026 – Sat, Aug 8, 2026
★ IMPACT 3/5 · ★ SOURCE-BACKED CLOSURE RECORD

Quick facts

Location
At MORNINGSIDE AVE
Start date
Wed, Aug 5, 2026 · 9:00 PM
End date
Sat, Aug 8, 2026 · 5:30 AM
Lanes affected
ALL LANES CLOSED
Severity
HeavyFull mainline closure
Source
Ontario 511Event ID 283280

Traffic context

Traffic today

This closure is one part of the day. The daily brief shows the event load, other road work, and the likely busy window from the same calendar data.

Day status
Heavy
Busy window
Arrival pressure likely builds 6 PM to 8 PM.
Main signal
ALL THE FEELINGS TOUR with METRIC, BROKEN SOCIAL SCENE, AND STARS + National Bank Open Toronto + RUSH: Fifty Something
  • ALL THE FEELINGS TOUR with METRIC, BROKEN SOCIAL SCENE, AND STARS
  • National Bank Open Toronto
  • Yorkville Ave

What's affected

HWY 401 (Westbound) at MORNINGSIDE AVE is impacted by a full mainline closure. The source lists affected lanes as: ALL LANES CLOSED.

Corridors to compare: Highway 7 runs east–west north of the 401, while the 407 ETR is a tolled east–west highway. Avenue Road, Yonge Street, and Eglinton Avenue are signalized local corridors. Which one wins depends on the day — check a live map before you leave.

Same-day events

Plan ahead

Read next