TODAY / AUG 2SEVERE
JAYS VS CARDINALS 1:37 PM ROGERS CENTREELM ST · FULL ROADWAY CLOSURE · BETWEEN UNIVERSITY AVE AND ELIZABETH STYONGE ST · FULL ROADWAY CLOSURE · YONGE ST AT DUNDAS ST W TO SHUTER ST
416TRAFFIC
Road closureWed, Aug 5, 2026 – Thu, Aug 6, 2026HWY 401 (Westbound)

Continuous Engineering Investigation on HWY 401 Westbound On-ramp at AVENUE ROAD, Toronto.

Road closure · Wed, Aug 5, 2026 – Thu, Aug 6, 2026
★ IMPACT 3/5 · ★ SOURCE-BACKED CLOSURE RECORD

Quick facts

Location
At AVENUE ROAD
Start date
Wed, Aug 5, 2026 · 11:00 PM
End date
Thu, Aug 6, 2026 · 5:00 AM
Lanes affected
ALL LANES CLOSED
Severity
HeavyFull ramp closure
Source
Ontario 511Event ID 281841

Traffic context

Traffic on Wed, Aug 5, 2026

This closure is one part of the day. The daily brief shows the event load, other road work, and the likely busy window from the same calendar data.

Day status
Heavy
Busy window
Arrival pressure likely builds 7 PM to 8:30 PM.
Main signal
5 Seconds of Summer: EVERYONE'S A STAR! World Tour + National Bank Open Toronto + Olivia Dean: The Art Of Loving Live
  • 5 Seconds of Summer: EVERYONE'S A STAR! World Tour
  • National Bank Open Toronto
  • Yorkville Ave

What's affected

HWY 401 (Westbound) at AVENUE ROAD is impacted by a full ramp closure. The source lists affected lanes as: ALL LANES CLOSED.

Corridors to compare: Highway 7 runs east–west north of the 401, while the 407 ETR is a tolled east–west highway. Avenue Road, Yonge Street, and Eglinton Avenue are signalized local corridors. A navigation app can compare current conditions and restrictions across these corridors.

Same-day events

Plan ahead

Read next