TODAY / SEP 3SEVERE
416TRAFFIC
ConstructionSun, Sep 20, 2026 – Fri, Sep 25, 2026HWY 401 (Westbound)

Nightly Engineering Investigation on HWY 401 Westbound Collector Off-ramp at LESLIE STREET, Toronto.

Construction · Sun, Sep 20, 2026 – Fri, Sep 25, 2026
★ IMPACT 4/5 · ★ SOURCE-BACKED CLOSURE RECORD

Quick facts

Location
At LESLIE STREET
Start date
Sun, Sep 20, 2026 · 11:59 PM
End date
Fri, Sep 25, 2026 · 5:30 AM
Lanes affected
2 Left Lane(s)
Severity
Heavy
Source
Ontario 511Event ID 299261

Traffic context

Traffic on Sun, Sep 20, 2026

This closure is one part of the day. The daily brief shows the event load, other road work, and the likely busy window from the same calendar data.

Day status
Heavy
Busy window
All day; arrival pressure builds 5 PM to 7 PM
Main signal
Thee Sacred Souls, LA LOM, & The Womack Sisters + Toronto International Film Festival (TIFF) + TTC Line 1 (Yonge-University)
  • Thee Sacred Souls, LA LOM, & The Womack Sisters
  • Toronto International Film Festival (TIFF)
  • Toronto Tempo vs. New York Liberty

What's affected

HWY 401 (Westbound) at LESLIE STREET is impacted by construction work. The source lists affected lanes as: 2 Left Lane(s).

Corridors to compare: Highway 7 runs east–west north of the 401, while the 407 ETR is a tolled east–west highway. Avenue Road, Yonge Street, and Eglinton Avenue are signalized local corridors. Which one wins depends on the day — check a live map before you leave.

Same-day events

Plan ahead

Read next