TODAY / OCT 30HEAVY
416TRAFFIC
ConstructionTue, Nov 3, 2026 – Wed, Nov 4, 2026HWY 401 (Eastbound)

Continuous Engineering Investigation on HWY 401 Eastbound Express Off-ramp at EGLINTON AVE, Toronto.

Construction · Tue, Nov 3, 2026 – Wed, Nov 4, 2026
★ IMPACT 4/5 · ★ SOURCE-BACKED CLOSURE RECORD

★ Quick facts

Location
At EGLINTON AVE
Start date
Tue, Nov 3, 2026 · 10:00 PM
End date
Wed, Nov 4, 2026 · 6:00 AM
Lanes affected
2 Right Lane(s)
Severity
Heavy
Source
Ontario 511Event ID 326468

Traffic context

Traffic on Tue, Nov 3, 2026

This closure is one part of the day. The daily brief shows the event load, other road work, and the likely busy window from the same calendar data.

Day status
Plan ahead
Busy window
Arrival pressure likely builds 6:30 PM to 7:30 PM.
Main signal
Leafs at Scotiabank Arena + TTC Line 1 (Yonge-University)
  • Lake Shore Blvd W
  • Leafs vs Utah Mammoth
  • TTC Line 1 (Yonge-University)

What's affected

HWY 401 (Eastbound) at EGLINTON AVE is impacted by construction work. The source lists affected lanes as: 2 Right Lane(s).

Corridors to compare: Highway 7 runs east–west north of the 401, while the 407 ETR is a tolled east–west highway. Avenue Road, Yonge Street, and Eglinton Avenue are signalized local corridors. Which one wins depends on the day — check a live map before you leave.

Same-day events

Plan ahead

Read next