TODAY / JUL 31SEVERE
416TRAFFIC
ConstructionSun, Aug 9, 2026 – Sat, Aug 15, 2026HWY 409 (Eastbound)

Nightly Maintenance on HWY 409 Eastbound between HWY 427 and ATTWELL DRIVE, Toronto.

Construction · Sun, Aug 9, 2026 – Sat, Aug 15, 2026
★ IMPACT 3/5 · ★ SOURCE-BACKED CLOSURE RECORD

Quick facts

Location
Between HWY 427 and ATTWELL DRIVE
Start date
Sun, Aug 9, 2026 · 10:00 PM
End date
Sat, Aug 15, 2026 · 5:00 AM
Lanes affected
2 Left Lane(s)
Severity
Heavy
Source
Ontario 511Event ID 281161

Traffic context

Traffic on Sun, Aug 9, 2026

This closure is one part of the day. The daily brief shows the event load, other road work, and the likely busy window from the same calendar data.

Day status
Heavy
Busy window
Arrival pressure likely builds 7 PM to 8 PM.
Main signal
National Bank Open Toronto + RUSH: Fifty Something + Lakeshore West GO line planned construction
  • National Bank Open Toronto
  • RUSH: Fifty Something
  • Lakeshore West GO line planned construction

What's affected

HWY 409 (Eastbound) between HWY 427 and ATTWELL DRIVE is impacted by construction work. The source lists affected lanes as: 2 Left Lane(s).

Same-day events

Plan ahead

Read next