TODAY / JUL 25SEVERE
FLEET STREET · FULL ROADWAY CLOSURE · FLEET STREET, ANGELIQUE STREET TO STRACHAN AVENUEYONGE ST · FULL ROADWAY CLOSURE · YONGE ST AT DUNDAS ST W TO SHUTER ST
416TRAFFIC
ConstructionTue, Aug 4, 2026 – Wed, Aug 5, 2026HWY 427 (Northbound)

Continuous Engineering Investigation on HWY 427 Northbound Off-ramp at EGLINTON AVENUE, Toronto.

Construction · Tue, Aug 4, 2026 – Wed, Aug 5, 2026
★ IMPACT 4/5 · ★ SOURCE-BACKED CLOSURE RECORD

Quick facts

Location
At EGLINTON AVENUE
Start date
Tue, Aug 4, 2026 · 9:00 PM
End date
Wed, Aug 5, 2026 · 5:00 AM
Lanes affected
1 Right Lane(s)
Severity
Heavy
Source
Ontario 511Event ID 278948

Traffic context

Traffic on Tue, Aug 4, 2026

This closure is one part of the day. The daily brief shows the event load, other road work, and the likely busy window from the same calendar data.

Day status
Heavy
Busy window
Arrival pressure likely builds 5:30 PM to 8:30 PM.
Main signal
Train & Barenaked Ladies with Matt Nathanson + National Bank Open Toronto + Olivia Dean: The Art Of Loving Live
  • Train & Barenaked Ladies with Matt Nathanson
  • National Bank Open Toronto
  • Olivia Dean: The Art Of Loving Live

What's affected

HWY 427 (Northbound) at EGLINTON AVENUE is impacted by construction work. The source lists affected lanes as: 1 Right Lane(s).

Corridors to compare: Highway 27 and Kipling Avenue run north–south near the 427 as surface corridors. Highway 410 is farther west and connects Brampton with the 401. A navigation app can compare current conditions and restrictions across these corridors.

Same-day events

Plan ahead

Read next