Nightly Maintenance on HWY 427 Northbound between CAMPUS ROAD/FASKEN DRIVE and DISCO ROAD/GOREWAY…
★ Quick facts
- Location
- Between CAMPUS ROAD/FASKEN DRIVE and DISCO ROAD/GOREWAY
- Start date
- Sun, Aug 9, 2026 · 10:00 PM
- End date
- Sat, Aug 15, 2026 · 5:00 AM
- Lanes affected
- 1 Left(with HOV) Lane(s)
- Severity
- Heavy
- Source
- Ontario 511Event ID 283648
Traffic context
Traffic on Sun, Aug 9, 2026
This closure is one part of the day. The daily brief shows the event load, other road work, and the likely busy window from the same calendar data.
- Day status
- Heavy
- Busy window
- Likely busiest 7 AM to 5 PM as traffic factors overlap.
- Main signal
- National Bank Open Toronto + RUSH: Fifty Something + Lakeshore West GO line planned construction
- National Bank Open Toronto
- Queen St E
- Yorkville Ave
What's affected
HWY 427 (Northbound) between CAMPUS ROAD/FASKEN DRIVE and DISCO ROAD/GOREWAY is impacted by construction work. The source lists affected lanes as: 1 Left(with HOV) Lane(s).
Corridors to compare: Highway 27 and Kipling Avenue run north–south near the 427 as surface corridors. Highway 410 is farther west and connects Brampton with the 401. Which one wins depends on the day — check a live map before you leave.
Same-day events
- National Bank Open Toronto
Aug 9 · Sobeys Stadium
- RUSH: Fifty Something
Aug 9 · Scotiabank Arena
- Lakeshore West Construction
Aug 9 · Toronto transit
- Toronto Blue Jays vs Boston Red Sox
Aug 10 · Rogers Centre
- National Bank Open Toronto
Aug 10 · Sobeys Stadium
- Toronto Blue Jays vs Boston Red Sox
Aug 11 · Rogers Centre
- National Bank Open Toronto
Aug 11 · Sobeys Stadium
- RUSH: Fifty Something
Aug 11 · Scotiabank Arena