TODAY / AUG 7HEAVY
YONGE ST · FULL ROADWAY CLOSURE · YONGE ST AT DUNDAS ST W TO SHUTER STQUEEN ST W · LANE CLOSURE · NEAR YONGE ST
416TRAFFIC
Road closureTue, Aug 11, 2026 – Sat, Aug 15, 2026HWY 427 (Southbound)

Nightly Maintenance on HWY 427 Southbound Off-ramp at FINCH AVENUE, Toronto.

Road closure · Tue, Aug 11, 2026 – Sat, Aug 15, 2026
★ IMPACT 3/5 · ★ SOURCE-BACKED CLOSURE RECORD

Quick facts

Location
At FINCH AVENUE
Start date
Tue, Aug 11, 2026 · 10:00 PM
End date
Sat, Aug 15, 2026 · 5:00 AM
Lanes affected
ALL LANES CLOSED
Severity
HeavyFull ramp closure
Source
Ontario 511Event ID 283625

Traffic context

Traffic on Tue, Aug 11, 2026

This closure is one part of the day. The daily brief shows the event load, other road work, and the likely busy window from the same calendar data.

Day status
Heavy
Busy window
Arrival pressure likely builds 5:30 PM to 8 PM.
Main signal
Jays at Rogers Centre + National Bank Open Toronto + RUSH: Fifty Something
  • Jays vs Sox
  • National Bank Open Toronto
  • Yorkville Ave

What's affected

HWY 427 (Southbound) at FINCH AVENUE is impacted by a full ramp closure. The source lists affected lanes as: ALL LANES CLOSED.

Corridors to compare: Highway 27 and Kipling Avenue run north–south near the 427 as surface corridors. Highway 410 is farther west and connects Brampton with the 401. Which one wins depends on the day — check a live map before you leave.

Same-day events

Plan ahead

Read next