TODAY / AUG 26SEVERE
416TRAFFIC
ConstructionSun, Aug 16, 2026 – Sat, Aug 22, 2026HWY 427 (Southbound)

Nightly Maintenance on HWY 427 Southbound Collector between DUNDAS STREET and EVANS AVE, Toronto.

Construction · Sun, Aug 16, 2026 – Sat, Aug 22, 2026
★ IMPACT 4/5 · ★ SOURCE-BACKED CLOSURE RECORD

Ended record

This closure record has ended. Use the current status pages for active road work and upcoming closures.

Quick facts

Location
Between DUNDAS STREET and EVANS AVE
Start date
Sun, Aug 16, 2026 · 10:00 PM
End date
Sat, Aug 22, 2026 · 5:00 AM
Lanes affected
2 Left Lane(s)
Severity
Heavy
Source
Ontario 511Event ID 286345

Traffic context

Traffic on Sun, Aug 16, 2026

This closure is one part of the day. The daily brief shows the event load, other road work, and the likely busy window from the same calendar data.

Day status
Heavy
Busy window
Arrival pressure likely builds 12 PM to 3:30 PM.
Main signal
Jays at Rogers Centre + AFC Toronto at BMO Field + THE KEHLANI WORLD TOUR: North America
  • Jays vs Yankees
  • AFC Toronto vs. Roses de Montréal FC
  • THE KEHLANI WORLD TOUR: North America

What's affected

HWY 427 (Southbound) between DUNDAS STREET and EVANS AVE is impacted by construction work. The source lists affected lanes as: 2 Left Lane(s).

Corridors to compare: Highway 27 and Kipling Avenue run north–south near the 427 as surface corridors. Highway 410 is farther west and connects Brampton with the 401. Which one wins depends on the day — check a live map before you leave.

Same-day events

Plan ahead

Read next