TODAY / SEP 18HEAVY
416TRAFFIC
ConstructionSun, Sep 20, 2026 – Fri, Sep 25, 2026HWY 427 (Southbound)

Nightly Maintenance on HWY 427 Southbound Express between BLOOR STREET and DUNDAS STREET, Toronto.

Construction · Sun, Sep 20, 2026 – Fri, Sep 25, 2026
★ IMPACT 4/5 · ★ SOURCE-BACKED CLOSURE RECORD

Quick facts

Location
Between BLOOR STREET and DUNDAS STREET
Start date
Sun, Sep 20, 2026 · 10:00 PM
End date
Fri, Sep 25, 2026 · 5:00 AM
Lanes affected
1 Left Lane(s)
Severity
Heavy
Source
Ontario 511Event ID 307653

Traffic context

Traffic on Sun, Sep 20, 2026

This closure is one part of the day. The daily brief shows the event load, other road work, and the likely busy window from the same calendar data.

Day status
Heavy
Busy window
All day; arrival pressure builds 5 PM to 7 PM
Main signal
Thee Sacred Souls, LA LOM, & The Womack Sisters + Toronto International Film Festival (TIFF) + TTC Line 1 (Yonge-University)
  • Thee Sacred Souls, LA LOM, & The Womack Sisters
  • Toronto International Film Festival (TIFF)
  • Toronto Tempo vs. New York Liberty

What's affected

HWY 427 (Southbound) between BLOOR STREET and DUNDAS STREET is impacted by construction work. The source lists affected lanes as: 1 Left Lane(s).

Corridors to compare: Highway 27 and Kipling Avenue run north–south near the 427 as surface corridors. Highway 410 is farther west and connects Brampton with the 401. Which one wins depends on the day — check a live map before you leave.

Same-day events

Plan ahead

Read next