TODAY / NOV 5HEAVY
416TRAFFIC
ConstructionThu, Nov 5, 2026 – Fri, Nov 6, 2026HWY 427 (Southbound)

Continuous Engineering Investigation on HWY 427 Southbound Off-ramp at EGLINTON AVE, Toronto.

Construction · Thu, Nov 5, 2026 – Fri, Nov 6, 2026
★ IMPACT 4/5 · ★ SOURCE-BACKED CLOSURE RECORD

★ Quick facts

Location
At EGLINTON AVE
Start date
Thu, Nov 5, 2026 · 10:30 PM
End date
Fri, Nov 6, 2026 · 5:30 AM
Lanes affected
1 Right Lane(s)
Severity
Heavy
Source
Ontario 511Event ID 331569

Traffic context

Traffic today

This closure is one part of the day. The daily brief shows the event load, other road work, and the likely busy window from the same calendar data.

Day status
Heavy
Busy window
All day; arrival pressure builds 7:30 PM to 8:30 PM
Main signal
TTC 160 bathurst north + Gardiner Expressway E restriction + MAVADO & Friends Live
  • Gardiner Expressway E
  • Lake Shore Blvd W
  • King St E

What's affected

HWY 427 (Southbound) at EGLINTON AVE is impacted by construction work. The source lists affected lanes as: 1 Right Lane(s).

Corridors to compare: Highway 27 and Kipling Avenue run north–south near the 427 as surface corridors. Highway 410 is farther west and connects Brampton with the 401. Which one wins depends on the day — check a live map before you leave.

Same-day events

Plan ahead

Read next