TODAY / NOV 22HEAVY
416TRAFFIC
Road closureMon, Nov 23, 2026 – Wed, Nov 25, 2026HWY 427 (Southbound)

Nightly Construction on HWY 427 Southbound Off-ramp at HWY 409, Toronto.

Road closure · Mon, Nov 23, 2026 – Wed, Nov 25, 2026
★ IMPACT 3/5 · ★ SOURCE-BACKED CLOSURE RECORD

★ Quick facts

Location
At HWY 409
Start date
Mon, Nov 23, 2026 · 10:00 PM
End date
Wed, Nov 25, 2026 · 2:00 AM
Lanes affected
ALL LANES CLOSED
Severity
HeavyFull ramp closure
Source
Ontario 511Event ID 337371

Traffic context

Traffic on Mon, Nov 23, 2026

This closure is one part of the day. The daily brief shows the event load, other road work, and the likely busy window from the same calendar data.

Day status
Heavy
Busy window
Arrival pressure likely builds 7 PM to 8 PM.
Main signal
Raptors at Scotiabank Arena + TTC Line 1 (Yonge-University) + TTC 512|312 Temporary service change due to streetcar infrastructure work
  • Raptors vs Milwaukee Bucks
  • TTC Line 1 (Yonge-University)
  • TTC 512|312 Temporary service change due to streetcar infrastructure work

What's affected

HWY 427 (Southbound) at HWY 409 is impacted by a full ramp closure. The source lists affected lanes as: ALL LANES CLOSED.

Corridors to compare: Highway 27 and Kipling Avenue run north–south near the 427 as surface corridors. Highway 410 is farther west and connects Brampton with the 401. Which one wins depends on the day — check a live map before you leave.

Same-day events

Plan ahead

Read next