TODAY / AUG 7HEAVY
YONGE ST · FULL ROADWAY CLOSURE · YONGE ST AT DUNDAS ST W TO SHUTER STQUEEN ST W · LANE CLOSURE · NEAR YONGE ST
416TRAFFIC
Road closureThu, Jul 30, 2026 – Fri, Aug 7, 2026Kennedy Rd

Road work with alternating traffic for transportation services on Kennedy Rd (between Mewburn Ave…

Road closure · Thu, Jul 30, 2026 – Fri, Aug 7, 2026
★ IMPACT 2/5 · ★ SOURCE-BACKED CLOSURE RECORD

Quick facts

Road
Kennedy Rd
Location
Between between Mewburn Ave and Park St
Start date
Thu, Jul 30, 2026 · 7:00 AM
End date
Fri, Aug 7, 2026 · 5:30 PM
Lanes affected
Road Closed Construction; Both Directions
Severity
Plan ahead

Traffic context

Traffic today

This closure is one part of the day. The daily brief shows the event load, other road work, and the likely busy window from the same calendar data.

Day status
Heavy
Busy window
Likely busiest 7 AM to 5 PM as traffic factors overlap with afternoon rush hour.
Main signal
ALL THE FEELINGS TOUR with METRIC, BROKEN SOCIAL SCENE, AND STARS + National Bank Open Toronto + RUSH: Fifty Something
  • ALL THE FEELINGS TOUR with METRIC, BROKEN SOCIAL SCENE, AND STARS
  • National Bank Open Toronto
  • Queen St E

What's affected

Kennedy Rd between between Mewburn Ave and Park St is impacted by a closure record. The source lists affected lanes as: Road Closed Construction; Both Directions.

Same-day events

Plan ahead

Read next