TODAY / NOV 16HEAVY
416TRAFFIC
ConstructionWed, Oct 28, 2026 – Thu, Nov 12, 2026QEW (Fort Erie Bound)

Nightly Construction on QEW Fort Erie Bound between HWY 427, Toronto and CAWTHRA ROAD, Mississauga.

Construction · Wed, Oct 28, 2026 – Thu, Nov 12, 2026
★ IMPACT 5/5 · ★ SOURCE-BACKED CLOSURE RECORD

Ended record

This closure record has ended. Use the current status pages for active road work and upcoming closures.

★ Quick facts

Location
At HWY 427
Start date
Wed, Oct 28, 2026 · 10:00 PM
End date
Thu, Nov 12, 2026 · 6:00 AM
Lanes affected
2 Alternating Lane(s)
Severity
Severe
Source
Ontario 511Event ID 326408

Traffic context

Traffic on Wed, Oct 28, 2026

This closure is one part of the day. The daily brief shows the event load, other road work, and the likely busy window from the same calendar data.

Day status
Severe
Busy window
Arrival pressure likely builds 6 PM to 8 PM.
Main signal
Toronto FC v D.C. United + Raptors at Scotiabank Arena + TTC Line 1 (Yonge-University)
  • Toronto FC v D.C. United
  • College St
  • Lake Shore Blvd W

What's affected

QEW (Fort Erie Bound) at HWY 427 is impacted by construction work. The source lists affected lanes as: 2 Alternating Lane(s).

Corridors to compare: Lakeshore Road parallels parts of the QEW through Mississauga and Burlington as a signalized local corridor. Highway 403 shares and branches from the QEW around Burlington and Hamilton. Which one wins depends on the day — check a live map before you leave.

Same-day events

Plan ahead

Read next