TODAY / OCT 30HEAVY
416TRAFFIC
ConstructionWed, Oct 28, 2026 – Thu, Nov 12, 2026QEW (Fort Erie Bound)

Nightly Construction on QEW Fort Erie Bound between HWY 427, Toronto and CAWTHRA ROAD, Mississauga.

Construction · Wed, Oct 28, 2026 – Thu, Nov 12, 2026
★ IMPACT 5/5 · ★ SOURCE-BACKED CLOSURE RECORD

★ Quick facts

Location
At HWY 427
Start date
Wed, Oct 28, 2026 · 10:00 PM
End date
Thu, Nov 12, 2026 · 6:00 AM
Lanes affected
2 Alternating Lane(s)
Severity
Severe
Source
Ontario 511Event ID 326408

Traffic context

Traffic today

This closure is one part of the day. The daily brief shows the event load, other road work, and the likely busy window from the same calendar data.

Day status
Heavy
Busy window
Arrival pressure likely builds 6:30 PM to 8 PM.
Main signal
Raptors at Scotiabank Arena + Marlies at Coca-Cola Coliseum + TTC Line 2
  • College St
  • Lake Shore Blvd W
  • Raptors vs Orlando Magic

What's affected

QEW (Fort Erie Bound) at HWY 427 is impacted by construction work. The source lists affected lanes as: 2 Alternating Lane(s).

Corridors to compare: Lakeshore Road parallels parts of the QEW through Mississauga and Burlington as a signalized local corridor. Highway 403 shares and branches from the QEW around Burlington and Hamilton. Which one wins depends on the day — check a live map before you leave.

Same-day events

Plan ahead

Read next